![]() The patented internal corner design provides compression strength allowing packs to be stacked in multiple layers without damage to produce. Innovative solutions for crate covers and melon carry packs are also available.Ĭonstructed from paperboard made from renewable plant-based fiber from sustainably managed forests, ProducePack fruit and vegetable packaging presents a premium ‘artisan-look’ alternative to existing plastic-based packaging substrates for brands and retailers looking to create differentiation in their produce offering. Novel features such as easy-carry handles and strengthened corners allow for ease of handling throughout the supply chain. The ProducePack carton range can be hand or machine packed for smaller scale or mass production. The visually stunning, easy to carry packs create great impact in the fresh produce aisle. Addition of the December 19, 2022, Violation Notice with a $10,000.00 increase to the monetary fine.ProducePack™ is a line of paperboard produce packaging that offers a variety of shelf-ready solutions for protecting and preserving fresh fruit and vegetables.Graphic Packaging is required to post Envirosuite monitoring network data no later than 90 days after the effective date of the Consent Order. Addition of timeline for Envirosuite data sharing.Changes were made to the originally proposed consent order in response to comments from the public. The consent order will require the company to pay a monetary fine of $109,270 and abide by a compliance plan. February 2023: EGLE and Graphic Packaging finalized the consent order on February 1, 2023, to resolve several violations at the facility. ![]() A violation notice was issued on December 19, 2022, for an alleged violation of Rule 901 due to strong and persistent odors detected off-site on December 14.The public comment period for this enforcement action will remain open until December 9, 2022. View the recording of the December 1, 2022, informational session and public hearing on the proposed enforcement action.An informational session and public hearing will be held on December 1, 2022, at 6:00 PM EST. Comments can be submitted at any time during the comment period ending on December 9, 2022. The Proposed Enforcement Summary has high level information about the proposed monetary penalty, a compliance plan, and penalties for future violations. November 2022 : EGLE is taking enforcement action and is seeking public input on a proposed consent order.A violation notice was issued on September 8, 2022, for installing equipment different than what was originally permitted, not keeping appropriate records and for failing a stack test. ![]() The information was valuable and EGLE is conducting a full, methodical, rigorous investigation of issues in and around the facility. The experimental data is still being analyzed and quality controlled. This was a nonregulatory study intended to assess and learn new drone technology.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |